|
|
|
|
| Re: Help: EDS card and Delta 1010 in same computer? [message #63343 is a reply to message #63340] |
Wed, 18 January 2006 15:39   |
Aaron Allen
 Messages: 1988 Registered: May 2008
|
Senior Member |
|
|
and you were to ship me a 110V PC power supply to put in the
>> server,
>> >>but even then I need to run the router as well. I guess you could ship
>> me
>> >>a 12V 1A plugpack as well.
>> >>
>> >>Much as it sounds good in theory I think by the time you added up all
> the
>> >>extra bits like shipment, stepdown transformer and all the other bits
> and
>> >>peices that would be needed to cater to the voltage difference, it
> wouldn't
>> >>really be worth it.
>> >>
>> >>I'm sure I can find something for under $200 down here...
>> >>
>> >>Cheers,
>> >>Kim.
>> >>
>> >>"DJ" <animix_spam-this-ahole_@animas.net> wrote:
>> >>>I'll check to see what it would cost to ship APC to AUS. A good friend
>> >here
>> >>>owns a UPS store and has other shipping providers as well. We've got a
>> >>>CompUSA here and I've got 4 x of these unit powering my MECs ,
> computers,
>> >>>monitors, clocks, converters and anything else that would bite me if I
>> >had
>> >>a
>> >>>power issue.
>>
>>>> http://www.compusa.com/products/product_info.asp?product_cod e=298348&pfp=
> ext
>> >>>ernal&tabtype=rv#moreinfo
>> >>>One of these would be more than enough to protect a single server, I
> would
>> >>&g
|
|
|
|
| Re: Help: EDS card and Delta 1010 in same computer? [message #63344 is a reply to message #63340] |
Wed, 18 January 2006 18:47   |
emarenot
 Messages: 345 Registered: June 2005
|
Senior Member |
|
|
t;think.
>> >>>
>> >>>Deej
>> >>>
>> >>>"DC" <dc@spamyermama.com> wrote in message news:43fa7db0$1@linux...
>> >>>>
>> >>>> No kidding.
>> >>>>
>> >>>> I went to the APC website and units that we pay 225.00 USD
>> >>>> are like 1250.00 Aus.
>> >>>>
>> >>>> Holy Cow! The exchange rate is about 1.35 Aus dollars to USD,
>> >>>> so that does not account for it. I hope you have some locally-
>> >>>> made ones that are good...
>> >>>>
>> >>>> DC
>> >>>>
>> >>>>
>> >>>>
>> >>>> >...and I'm highly suspicious it would be cheaper to buy one here.
> :o)
>> >>>> >
>> >>>> >Cheers,
>> >>>> >Kim.
>> >>>>
>> >>>
>> >>>
>> >>
>> >
>>
>
>Hi,
Got a new 8-IN card , put it in , it's not in the Patch Bay.
Do I need to do anything to enable it? It's in the second MEC ( not master).
Thanks,
DaveIn the patchbay, double click on the "MEC Modules" box for that MEC.
Does the module appear in the list top right? If so, drag it into the
window at the left to use it.
David.
Dave Geoghegan wrote:
> Hi,
> Got a new 8-IN card , put it in , it's not in the Patch Bay.
>
> Do I need to do anything to enable it? It's in the second MEC ( not master).
>
> Thanks,
>
> Dave
>
>
>
>Go to www.microsoft.com/office and grab some templates there to tweak to
your liking.
Cover the usual stuff
Period of contract (rent for how long in your case and at what rate during
what hours, etc)
Damages: When due and on what basis
Rentals: If your stuff breaks midsession, who covers the costs of
replacement rental gear?
Do a walk through inventory ch
|
|
|
|
| Re: Help: EDS card and Delta 1010 in same computer? [message #63345 is a reply to message #63343] |
Wed, 18 January 2006 19:05  |
emarenot
 Messages: 345 Registered: June 2005
|
Senior Member |
|
|
eck before the rental starts and once they are
done, on your time.
A lot of guys forget this one - who cleans up after the band?
Smoking, drugs, drinks.. you allow 'em in the studio? Cover it.
If they want to extend the contract time to complete an over run schedule,
how will that be handled?
Well, you get the idea. Have fun man!
AA
"Rob Arsenault" <info@studiomanitou.com> wrote in message
news:43fb6165$1@linux...
> Yea man, this is a good point, never thought of that.
>
> As for myself, I am planning on renting my space to a reputable
> band/producer from this area. They will be using the studio and some
> equipment for a set period of time and I just wanted to get some sort of
> written agreement stating the expectations of both parties. It's my first
> time down this road, I usually only do hourly rates and no one else
> touches my toys...!!
>
> "RZ" <pearlmusic@sbcglobal.net> wrote in message news:43fb5d48$1@linux...
>> Rob,
>>
>> I have never had a signed contract while working on an hourly basis,
>> which is 98% of the time. But at one time I used to charge clients for
>> backing up data before it was cheap and easy to do. I had them sign a
>> form to acknowledge that it was their responsibility to do so. But in
>> recent years, I have come to routinely back up sessions for free without
>> the clients even being aware. However, I still see this as the greatest
>> liabilty that we have as studio operators. Where clients used to take
>> their tapes home with them, now they seem content to let their work live
>> on our hard drives, trusting that it will always be there.
>>
>> We always assume everything is ok until something goes wrong. It would
>> be good to have clients sign a form to acknowlege that they are
>> ultimately responsible for backing up data and we can not be held liable
>> in the event of catastrophy.
>>
>&
|
|
|
|